REPRESENTATIVE PROJECTS GEOTECHNICAL INVESTIGATION AND SOIL/WATER STUDIES |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
1998 |
Hamed Al-Khalid |
6,000 |
Jeliaa Beach Resort |
Geotechnical Investigation |
|
1998 |
Al-Imad Real Estate Co. |
9,000 |
Laila Residential Complex |
Geotechnical Investigation |
|
1998 |
MPW/Asian Engineering |
3,000 |
Chest Diseases Hospital |
Geotechnical Investigation |
|
1998 |
PAHC |
18,000 |
Jleib Al-Shuyoukh, Block 2 Sector No.14 & 26 Tender MNRS/14/1993 |
Geotechnical Investigation |
|
1998 |
Ghassan Al-Khalid |
7,500 |
Earth Works Specifications Al-Zour Beach |
Geotechnical Investigation |
|
1999 |
Civil Aviation/Qualimetrics |
4,000 |
Different areas in Kuwait |
Geotechnical Investigation |
|
2000 |
Civil Aviation/Qualimetrics |
4,000 |
Different areas in Kuwait |
Geotechnical Investigation |
|
2001 |
EPA/Kuwait University |
90,000 |
Investigation of Solid Waste area at Al-Qurain |
Geotechnical Investigation and hydrogeological study |
|
2001 |
PEAAT/PACE |
10,500 |
PEAAT Al-Ardia School |
Geotechnical Investigation |
|
2002 |
MOH/Langdon Wilson Int’l |
4,000 |
Cardiac Annex/Shuwaikh |
Geotechnical Investigation |
|
2002 |
MPW/UGC |
30,000 |
Mishref Pump Station/Mishref |
Instrumented full ssscale pump test |
|
2002 |
MPW/COWI |
36,000 |
Subiya Causeway / Subiya |
Supervisor for field/laboratory testing programs |
REPRESENTATIVE PROJECTS GEOTECHNICAL INVESTIGATION AND SOIL/WATER STUDIES |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2002 |
KCPC |
9,000 |
Ashaab Health Club |
Plate load testing program |
|
2002 |
Al-Bannai/PWH |
8,000 |
Ardiya, Farwania |
Geotechnical Investigation |
|
2003 |
Club of Hearing Impaired/PACE |
3,000 |
Doha, Hearing Impaired club |
Geotechnical Investigation Drilling BH, SPT, Lab Testing |
|
2004 |
La' Ala Al-Kuwait Co. Infrastructure |
100,000 |
Khairan Pearl / Khairan |
Geotechnical Investigation SPT, CPT, Lab Testing |
|
2003/2004 |
La' Ala Al-Kuwait Co. |
500,000 |
Khairan Pearl / Khairan |
Establishing Soil Lab. for Earthwork/ Rock testing/ Concrete testing on site |
|
2004 |
Kuwait Municipalty/PACE |
5,000 |
Municipality Car Park |
Geotechnical Investigation |
|
2004 |
Al-Mal real Estate / Ahmadia |
5,000 |
Dhow Tower |
Geotechnical Investigation 3D Foundation Model |
|
2004 |
Perini Corp. US Army CORP. of Engineers |
80,000 |
Nasiriya Power Station |
Geotechnical Investigation |
|
2004 |
PAAET/PACE |
5,000 |
PAAET – Sabahiya |
Geotechnical Investigation |
|
2004 |
Sadeeq Co.op/ PACE |
6,000 |
Sadeeq Coop. – South Sura |
Geotechnical Investigation |
|
2004 |
La' Ala Al-Kuwait Co. |
35,000 |
Industrial area – Khiran Pearl City |
Geotechnical Investigation |
|
2004 |
La' Ala Al-Kuwait Co. |
6,000 |
Water Tower - Khiran Pearl City |
Geotechnical Investigation |
REPRESENTATIVE PROJECTS GEOTECHNICAL INVESTIGATION AND SOIL/WATER STUDIES |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2004 |
Ahmadiah |
6,000 |
Khiran Pearl City |
Borehole drilling |
|
2004 |
Panarab |
9,000 |
Geotechnical Investigation for Asian Olympic Council Complex |
Geotechnical Investigation
-Drilling in soil to 40m BGL , soil sampling and testing - Geotechnical material assessment for the proper foundation, excavation and dewatering systems. |
|
2004 |
Ahmadiah |
4,000 |
Geotechnical Investigation for Residential Towe at Dasman – Sharq |
Geotechnical Investigation
|
|
2005 |
COWI |
31,500 |
Subiya Causeway / Subiya |
Supervisor for field/laboratory testing programs |
|
2005 |
Panarab |
18,000 |
Arraya Tower II / Sharq |
Deep drilling / Test pressuremeter, cross hole test |
|
2005 |
La' Ala Al Kuwait |
10,000 |
Khiran Pearl City |
Plate Load Test |
|
2005 |
La' Ala Al Kuwait |
8,000 |
Khiran Pearl City |
Ground water monitoring wells |
REPRESENTATIVE PROJECTS TOPOGRAPHIC ENGINEERING, BATHIMETRIC/HYDROGRAPHIC SURVEYS |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2000 |
MPW |
25,000 |
MPW/ Sabah Al-Nasser |
Topographic mapping at 1/2000 scale |
|
2000 |
MPW |
13,000 |
MPW Fintas Agricultural Area |
Topographic mapping at 1/2000 scale |
|
2000 |
Gulf Consult |
20,000 |
Nuwaseeb Border Post |
Topographic mapping at 1/2000 scale |
|
2000 |
ASCO |
50,000 |
Industrial Areas (Subhan, Sulaybia, Amgara & Doha) |
Topographic mapping at 1/2000 scale |
|
2000 |
Gulf Consult |
17,000 |
Fahaheel coastal shore |
Bathymetric survey of area 2km by 1km |
|
2000 |
Mesila Beach Hotel |
4,500 |
Messilah Beach Hotel |
Bathymetric survey of area 500m by 500m |
|
2000 |
First Kuwaiti Co. |
4,500 |
Private Marine At Mahbula |
Bathymetric survey of area 500m by 500m |
|
2000 |
Pepsi Cola |
16,000 |
Pepsi Cola I Subhan |
Survey (Plans & elevations) |
|
2000 |
Gulf Consult |
9,000 |
Al-Mula Garage Shuwaikh |
Survey (Plans & elevations) |
|
2001 |
MEW |
23,000 |
Pipiline From Mina Abdulla to Wafra
|
Topographic mapping at 1/2000 scale |
|
2001 |
Equestrian Club |
8,000 |
Hunting Equestrian Club |
Topographic mapping at 1/2000 scale |
REPRESENTATIVE PROJECTS TOPOGRAPHIC ENGINEERING, BATHIMETRIC/HYDROGRAPHIC SURVEYS |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2001 |
First Kuwaiti Co. |
3,000 |
Fintas Project |
Bathymetric survey |
|
2001 |
First Kuwaiti Co. |
7,000 |
Private Marine At Salmiya |
Bathymetric survey of area 500m by 500m |
|
2001 |
National Council of Art |
10,000 |
Shrqieh Girls School |
Survey (Plans & elevations) |
|
2001 |
EPA/Kuwait University |
3,000 |
Solid Waste area At Al-Qurain |
Topographic mapping at 1/1000 scale |
|
2003 |
Kharafi / SSH |
3,000 |
Al-Qurain Solid waste area |
Topographic mapping at 1/1000 scale |
|
2004 |
MOD / Al-JAWAD |
5,000 |
JAHRA CAMP |
Topographic mapping |
|
2004 |
La' Ala Al-Kuwait Co. |
20,000 |
Khairan Pearl |
Pathymetric /Topographic Survey |
|
2004 |
PAAET / PACE |
4,000 |
PAAET – Sabahiya |
Topographic Survey |
|
2004 |
Sadeeq Co.op / PACE |
4,000 |
Sadeeq Co.op – South Sura |
Topographic Survey |
|
2004 |
Panarab |
3,000 |
For Asian Olympic Council Complex – Salmya |
Topographic Survey |
|
2005 |
Panarab |
1,000 |
Al Anwar Center |
Topographic Survey |
|
|
|
|
|
|
|
|
|
|
|
REPRESENTATIVE PROJECTS STRUCTURAL EVALUATION AND CONCRETE REPAIR DESIGN |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
1992 |
KNPC/RPT |
22,500 |
KNPC Refineries Restoration Project |
Structural Testing |
|
1996 |
Ahmed Al-Wazzan |
5,000 |
Private Villa at Khaldiya |
Detail Structural Survey & Remedial Measures for Concrete Deterioration |
|
1997 |
KNPC |
7,000 |
Modernization of 3 reactors Shuaiba |
Structural Survey & Damage Assessment |
|
1997 |
KNPC |
15,000 |
Lube Oil Factory Shuaiba |
Structural Survey & Evaluation of Industrial Tanks |
|
1998 |
Kuwait Club/Burhan Co. |
6,000 |
VIP Hall & Duwaniah at Soccer Hall Stadium Kuwait Sports Club |
Stability Analysis & Design of Support System
|
|
1998 |
MPW/S.S.H. |
9,000 |
Guest Palace Bayan Palace - Phase II |
Structural Survey & Crack mapping |
|
1998 |
DGCA |
3,000 |
Rehabilitation for Kwt. Airport Terminal Building |
Structural Assessment Program |
|
1998 |
PIC |
12,000 |
Salt and Chlorine Plant PIC - Shuaiba |
Structural Survey & Damage Assessment |
|
1998 |
National Council of Culture, Arts and Literature |
7,000 |
Dickson House Restoration |
Structural Survey & Damage Assessment |
|
1998 |
KNPC |
15,000 |
Lube Oil Plant
|
Structural Survey & Damage Assessment of Tank Farm |
REPRESENTATIVE PROJECTS STRUCTURAL EVALUATION AND CONCRETE REPAIR DESIGN |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2000/2001 |
Civil Aviation/Qualimetrics |
60,000 |
Weather Station in Kuwait |
Structural Survey and assessment of existing structures |
|
2001 |
Al-Ostoura Co. |
10,000 |
Structural Design Dana Center |
Structural survey and steel structural support of existing structure including design of car rotating display platform |
|
2002 |
NCCAL/Modern System |
2,400 |
Design of support system to the damaged Al-Qurain Al-Shuheda House |
Design of steel structural support |
|
2002 |
MOH/Langdon Wilson Int’l |
12,000 |
Design of reinforced concrete structure CARDIAC ANNEX Shuwaikh |
Structural design and detail of reinforced concrete structure |
|
2002 |
VIP Chateau Health Club/ Dourwaza Office |
4,000 |
VIP Chateau Health Club Bneid AlGar |
Structural survey as built condition |
|
2002 |
Al-Bannai/Private Sector |
3,000 |
Private Building In Salwa |
Evaluation of Building movement and cracks |
|
2003 |
DGCA |
1,50,000 |
2002-2003/15 Testing Evaluation Fire effected Concrete structure |
Structural Testing, Evaluation, Capacity analysis, Structural analysis, Design of repair scheme of concrete member, Supervising concrete repair, Structural load Test. |
REPRESENTATIVE PROJECTS STRUCTURAL EVALUATION AND CONCRETE REPAIR DESIGN |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2003 |
DGCA/Arab Center |
2,000 |
Water Tank/ Airport |
Structural Analysis and Evaluation |
|
2003 |
Al-Nafisi/ Ahmadiya |
12,000 |
Arraya Tower, Sharq |
Structural Analysis |
|
2003 |
Ahmadiya |
3,000 |
Salhiya Car Park |
Survey of Dynamic Impact on Concrete Structure. |
|
2004 |
DGCA |
300,000 |
Testing, evaluation and assessment of Block B and C |
3D Simulation of the existing terminates and evaluation of structural capacity |
|
2004 |
DGCA |
21,000 |
Testing, evaluation and assessment of Block F and G |
3D Simulation of the existing Blocks F & G terminates and evaluation of structural capacity |
|
2004 |
MPW / Horizon Enterpirzes |
12,000 |
Structural analysis & repair design for Ministry complex car park area |
Structure analysis & repair design |
|
2004 |
Al Oustura |
1,500 |
For Al Oustura – Stair Case Structure Assessment |
Structural assessment & Steel design |
|
2004 |
Commercial Bank of Kuwait |
3,000 |
For CBK – KIA Br. |
Structural Analysis. |
|
2005 |
Al Jawad |
18,000 |
Jassim Al Bashar Dahia Villa |
Structural Analysis. |
|
2005 |
Al Maousherji Catering Co. |
36,750 |
McDonald – KIA Br. |
Erection of McDonald's Structural support of the frame under McDonald's Restaurant at KIA |
REPRESENTATIVE PROJECTS GEOTECHNICAL DESIGN FOR DEEP FOUNDATION |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
1998 |
MPW/UGC |
1,500 |
Sewage Renovation Phase III Part A, Kuwait City Pumping Contract SE/18/96-97 |
Checking Dewatering System and Design New System |
|
1998 |
Al-Sharq Co. |
3,000 |
Al-Shaya Warehouse Shop No.5 At Shuwaikh |
Structural assessment of Slab on grade |
|
2000 |
Al-Imad Real Estate/ Jaberco |
1,500 |
Tower crane pile foundation Salmiya |
Design of pile and cap |
|
2002 |
MPW/UGCC |
6,000 |
Mishref Pump Station Mishref |
Design of dewatering system |
|
2002 |
MPW/UGCC |
6,000 |
Mishref Pump Station Mishref |
Design of slope stability |
|
2002 |
MPW/UGCC |
15,000 |
Mishref Pump Station Mishref |
Full scale instrumented pump test |
|
2003 |
MEW/ HYUNDAI |
5,000 |
Shamiya S/S Design of Raft Foundation |
Concrete Structural Design of raft foundation of raft on pile by FEM |
|
2004 |
MPW/ Al-Aswar Technology |
30,000 |
Design of pile and footing |
Concrete Structural Design of pile and footing for telecommunication tower |
REPRESENTATIVE PROJECTS GEOTECHNICAL DESIGN FOR DEEP FOUNDATION |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2004 |
National Khorafi / Al-Aswar Technology |
100,000 |
Design of footing |
Concrete Structural Design of footing for telecommunication tower |
|
2004 |
PERINI CORP. US ARMY CORP. of Engr's |
30,000 |
Nasiriya / Iraq |
Design of Driven piles and capping for machinery foundations |
|
2004 |
Mishref Company / Ghannam & Al sayegh |
3,000 |
Design of piling foundation for tower crane - Mishref |
Detail design of precast driving piles with cap |
|
2005 |
DGCA / ALMOS |
24,000 |
AWOS / All over Kuwait |
Designing Foundation for different instrumentation and weather stations |
|
|
|
|
|
|
|
|
|
|
|
|
REPRESENTATIVE PROJECTS MARINE GEOTECHNICAL INVESTIGATION |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
1996 |
National Real Estate Co./KEO |
24,000 |
Al-Sharq Water Front Kuwait City |
Offshore Soil Investigation |
|
1998 |
KNPC/Mouchel International |
300,000 |
MAA-Refinery New Oil Jetty And Topside Facilities |
Geotechnical Study |
|
1999 |
United Real Estate Co. |
30,000 |
Salmiya Water Front Proj. Kuwait City |
Water Quality & Testing of Materials |
|
2001 |
Civil Aviation/Qualimetrics |
30,000 |
AWOS at different locations in Kuwait |
Checking the existing AWOS marine stations |
|
2002 |
MPW/COWI |
9,000 |
Subiya Causeway Subiya - Kuwait |
Geotechnical supervision on site |
|
2004 |
La'Ala Al Kuwait Co. |
20,000 |
Drilling in Khor Al'Ama in Khairan |
Geotechnical Investigation for cap rock and marine sedimentation |
|
|
|
|
|
|
REPRESENTATIVE PROJECTS CONSTRUCTION MATERIAL TESTING (ITLS) |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
1993 |
KAC/Mohamed Al-Rajhe Co. |
13,500 |
Hangar 747 Ground Slabs Kuwait Airport |
Structural & Material Testing |
|
1993 |
Al-Nazaer Co. |
3,000 |
Assessment of Fire Damage Concrete Structure, at Subhan |
Material Testing |
|
1994/95 |
KNPC/CONCO |
20,000 |
Small Boat Harbour Project, Mina Abdullah |
Materials Testing & Quality Control |
|
1995 |
KOC/The Ralph Parsons |
22,500 |
KOC Ex-Main Office Ahmadi |
Material Strength Testing & Structural Survey |
|
1997 |
Al-Awqaf |
30,000 |
Testing, evaluation and analysis of Historical Mosque |
Material Testing & Structural Survey |
|
1999 |
U.S. Embassy/H.Behbehanni |
10,000 |
Constr. of Housing Project |
ITLS, Material Testing, Topographic Survey |
|
2000 |
Private/Kuwait-German Ready Mix |
1,500 |
Evaluation of hardened concrete/South Surra |
Material testing |
|
2001 |
PEAAT/Alghanim Int’l. |
1,500 |
PEAAT Project/ Shuwaikh |
Checking the hardened concrete |
|
2001 |
Private/A-Watania Ready Mix |
3,000 |
Evaluation of structure/South Surra |
Structural analysis & material testing |
|
2002 |
National Museum/PACE |
13,500 |
Renovation of BLDG#3 Kuwait National Museum |
Structural survey & Material testing |
|
2003 |
KCPC |
4,000 |
Al-Shaab Club |
PLT& other material Testg. |
|
|
|
|
|
REPRESENTATIVE PROJECTS CONSTRUCTION MATERIAL TESTING (ITLS) |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2004
2005
|
La’ Ala’ Al-Kuwait
La’ Ala’ Al-Kuwait
|
360,000
360,000
|
Material Testing ITLS , Khairan Providing Mobile Lab on site for concrete, soil, material sediments. |
Earth work/concrete rock testing includes:- - soil classification test ASTM, BS - soil strength tests, ASTM, BS - testing Beach Sand Sampling for cleaning oerobic Bacteria and fine silt material from Beach SAND. - Armour Rock testing , channel reinforcement rock testing. - Environment testing for H2s, Odor water quality |
REPRESENTATIVE PROJECTS GEOTECHNICAL/STRUCTURAL / ENVIRONMENTAL INSTRUMENTATION |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
1995 |
MEW/Kuwait Institute of Scientific Research |
132,000 |
Pilot Drainage Project Sabah Al-Salem/Khifan and Shamiya |
Installation of 75m deep magnetic and rod extensometer, pressure transducers, water level sensors, data loggers and providing maintenance services (Soil instruments and Geocon) |
|
1995 |
Kuwait Real Estate Co. |
48,000 |
Salmiya Market Ground Preloading Test - Salmiya |
Installation of magnetic extensometers, settlement plates, pneumatic piezometers, casagrande piezometers and monitoring services |
|
1997 |
Nouf Real Estate Co./ Oha Engineering |
48,000 |
Salmiya Market Monitoring of Preloading Process |
Installation of casagrande piezometers and settlement plates |
|
1998 |
Nouf Real Estate Co./ Oha Engineering |
45,000 |
Salmiya Market Monitoring of Preloading Process |
Monitoring of Settlements and PWP. during preloading |
|
2000/2001 |
EPA/Kuwait University |
90,000 |
Solid Waste Investigation/ Al-Qurain |
Installation of Magnetic extensometers/Pneumatic piezometers/Casagrande Piezometers, monitoring samples |
|
2002 |
MPW/UGCC |
30,000 |
Mishref Pump Station |
Fully instrumented pump test for deep dewatering system design |
|
2004 |
Al Mal Tower / Ahamadia |
3,000 |
Writing proposal for Tilting and Excavation - Sharq |
Writing technical proposal |
|
|
|
|
|
|
REPRESENTATIVE PROJECTS GEOTECHNICAL/STRUCTURAL / ENVIRONMENTAL INSTRUMENTATION |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2004 |
DGCA |
150,000 |
ATCT tower instrumentation – KIA (Proposal) |
Instrumentation for tilt and Earth Quick |
|
2004 |
PAHC / Golden Shaheen |
Proposal |
Arifjan, Developing residential new area. |
- Gophysical survey by seismic refractions, gravimeter, resistivitiy and tomography. Noise and Air pollution survey |
REPRESENTATIVE PROJECTS ENVIRONMENT TESTING & EIA |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2002 |
EPA/KU |
90,000 |
Study Evaluation of municipal solid waste, Al-Qurain Area |
1. Drill borehole in highly contaminated hazardous field. 2. Collecting hazardous samples GW/ water/Soil 3. Monitoring GWL and developing the simulation ground water motel 3D 4. Full scale pump test 5. Instrumental preloading trial 6. CPT on MSW 7. Topographic survey |
|
2003 |
Kharafi/SSH |
45,000 |
Preparing technical/ Financial specification for Al-Qurain MSW area. |
Design the technical financial requirement for treatment /rehabilitation |
|
2003 |
MPW/UGC |
30,000 |
Mishref Pump Station |
Design of dewatering system to eliminate H2S |
|
2004 |
PIC / RIMKUS |
3,000 |
UREA Plant Sewer, Shuaiba |
Pit design of sewer Pit CAPS baskets |
|
2003/2004 |
Kuwait Municipality / SSH |
50,000 |
Qurain land fill rehabilitation program |
Writing environmental proposal for land fill area |
REPRESENTATIVE PROJECTS ENVIRONMENT TESTING & EIA |
|
DATE |
OWNER/CLIENT |
CONTRACT BUDGET ($) |
PROJECT/LOCATION |
ACTIVITY |
|
2003/2004 |
Kuwait Municipality / SSH |
50,000 |
Qurain land fill rehabilitation program |
Writing environmental proposal for land fill area - Design program to study Lithology, Hydrogeology for the area. - Design concept for liner cover system - Design concept for improving soil layer system - Design concept for Gas management and control system - Design concept for Leachate control & management system |
|
2004 |
PAHC – Golden Shaheen |
Proposal |
Proposal for Studying the Noise, Control and Air pollution for Arifjan area and impact of new residential area on the Direct Environment |
- Design study program to control Noise immersion and Air quality in the area |